Uptime Report Research · Energy and Infrastructure

Data Center Statistics 2026: Power Use Rose 100 TWh While US Demand Rose 8, and Construction Hit $85 Billion

Data center statistics usually come from vendor estimates. We pulled the federal series instead. US data centers used 176 TWh of electricity in 2023, 4.4% of the national total, up from 1.9% in 2018 (Lawrence Berkeley National Laboratory). Private data center construction reached a $85.0 billion annual rate in August 2026 (Census Bureau), up 73% in a year.

Dial: data centers used 4.4% of US electricity in 2023; the red arc marks the 2028 scenario range of 6.7% to 12.0% on a 0 to 15% scale4.4%SHARE OF US ELECTRICITY2023; 2028 scenario 6.7% to 12.0%Dial: 176 TWh used by US data centers in 2023; the red arc marks the 2028 scenario range of 325 to 580 TWh on a 0 to 600 TWh scale176 TWhANNUAL ELECTRICITY USE2023; 2028 scenario 325 to 580Dial: private data center construction at $85.0 billion annual rate in August 2026 on a 0 to 100 billion scale; the white tick marks $49.1 billion a year earlier$85.0BCONSTRUCTION, ANNUAL RATEAugust 2026, up 73% in a yearDial: average data center PUE of 1.4 in 2023 on a 1.0 to 2.0 scale; the white tick marks 1.6 in 20141.4AVERAGE PUE2023, down from 1.6 in 2014
20 GWaverage round-the-clock draw of all US data centers, 2023
12xTWh added by data centers vs by all US electricity use, 2018 to 2023
629,527employees in NAICS 518210, 2023 (Census CBP)
66B literswater consumed on site by US data centers, 2023 (LBNL)

How much electricity do data centers use?

Lawrence Berkeley National Laboratory’s December 2024 report for the Department of Energy is the most detailed public estimate of US data center electricity use. It puts consumption at about 60 TWh a year from 2014 to 2016, 76 TWh in 2018, and 176 TWh in 2023. We divided each year by the Energy Information Administration’s total US electricity end use to get the share, which reproduces LBNL’s own 1.9% for 2018 and 4.4% for 2023.

Data center share of US electricity use, 2014 to 2023, and the 2028 scenario range

0%2%4%6%8%10%12%LBNL scenario range for 2028: 325 to 580 TWh, 6.7% to 12.0% of forecast US electricity use2014: 60 TWh, 1.5% of US electricity end use (TWh read from LBNL chart)2015: 61 TWh, 1.6% of US electricity end use (TWh read from LBNL chart)2016: 64 TWh, 1.6% of US electricity end use (TWh read from LBNL chart)2017: 70 TWh, 1.8% of US electricity end use (TWh read from LBNL chart)2018: 76 TWh, 1.9% of US electricity end use2019: 89 TWh, 2.3% of US electricity end use (TWh read from LBNL chart)2020: 106 TWh, 2.7% of US electricity end use (TWh read from LBNL chart)2021: 128 TWh, 3.2% of US electricity end use (TWh read from LBNL chart)2022: 151 TWh, 3.7% of US electricity end use (TWh read from LBNL chart)2023: 176 TWh, 4.4% of US electricity end use2014: 1.5%2018: 1.9%2023: 4.4% (176 TWh)12.0%580 TWh6.7%325 TWhLBNL 2028 scenario range20142016201820202022202420262028

Solid dots: values stated in the LBNL text (2018, 2023). Open dots: annual values read from LBNL Figure ES-1 (accurate to about 2 TWh). Denominator: EIA total electricity end use (retail sales plus direct use). The 2028 range uses LBNL’s stated shares.

The share more than doubled in five years. Data center use rose by about 100 TWh between 2018 and 2023. Over the same years, total US electricity end use rose by just 8 TWh, from 4,003 to 4,011 TWh. Data centers added about 12 times as many TWh as the whole country did, so everything else, taken together, used less: US end use excluding data centers fell from 3,927 to 3,835 TWh. Year-to-year totals move with weather, so we checked a second start year. From 2019, data centers added about 87 TWh against 57 TWh for the national total.

Data center power consumption in gigawatts and households

176 TWh a year is an average load of about 20.1 GW, running every hour of the year, or about 482 GWh per day. It equals 12% of all electricity that US households bought from utilities in 2023 (1,450 TWh). LBNL’s scenarios for 2028 range from 325 to 580 TWh. At an assumed 50% average capacity utilization, LBNL translates that into 74 to 132 GW of total power demand, and 6.7% to 12.0% of forecast US electricity consumption.

Why the range is so wide. LBNL varies three things for 2028: how many AI GPUs are shipped, how hard the installed servers run, and which cooling systems new facilities use. The high case is almost 1.8 times the low case, so treat any single 2028 number as one scenario, not a forecast.

The latest national data show demand still rising. EIA’s total US electricity end use reached 4,195 TWh in 2025, up 184 TWh from 2023, and the first six months of 2026 were 1.1% above the same months of 2025. EIA does not break out data centers in these totals, so the share of that growth due to data centers is not measured directly. Our data centers by state report shows where commercial electricity sales grew fastest since 2019.

Data center construction spending

The Census Bureau has tracked private data center construction as its own category since 2014 (it was folded into general office before that). Spending rose from $1.8 billion in 2014 to $49.7 billion in 2025, about 28 times as much. From January to August 2026, Census counts $45.2 billion, 42% more than the same months of 2025 ($31.9 billion) and already 91% of the full 2025 total.

Private data center construction put in place, by year (billions of dollars)

2014 to 2022 2023 to 2025 2026, January to August only

$0B$10B$20B$30B$40B$50B2014: $1.8 billion1.820142015: $2.7 billion2.720152016: $4.1 billion4.120162017: $4.7 billion4.720172018: $6.9 billion6.920182019: $8.5 billion8.520192020: $9.2 billion9.220202021: $9.9 billion9.920212022: $12.6 billion12.620222023: $20.0 billion20.020232024: $34.8 billion34.820242025: $49.7 billion49.720252026 (Jan to August): $45.2 billion45.22026*

*2026 is a partial year (January to August, not seasonally adjusted; August is preliminary). Annual values are sums of Census monthly estimates and match the Census annual table.

On a seasonally adjusted annual rate basis, data center construction passed general office buildings for the first time in April 2025, fell back below for four months, and has stayed above it every month since September 2025. By August 2026 it ran at $85.0 billion a year against $45.8 billion for general office, and it was larger than private health care construction ($57.0 billion) and lodging ($23.3 billion). Data centers now account for 11.0% of all private nonresidential construction.

Monthly construction spending, seasonally adjusted annual rate

$0B$20B$40B$60B$80BApril 2025: data centers pass general office for the first timefirst passes office, April 2025Data centers $85.0BGeneral office $45.8B2014201620182020202220242026

Census Value of Construction Put in Place, private. General office excludes data centers and financial buildings. Recent months are revised in later releases.

Data center jobs and employers

The closest federal employment series is the Census County Business Patterns count for NAICS 518210, now titled computing infrastructure providers, data processing, web hosting, and related services. In 2023 it had 18,544 establishments, 629,527 employees, and $93.0 billion in annual payroll. Since 2019, employment grew 13.9% and payroll grew 49.3%, while establishments grew only 7.2%, so the industry is adding staff and pay faster than locations. Average pay was $147,665, 2.2 times the $68,342 average across all industries in the same Census file. For the wider IT services picture, see how hosting revenue outgrew the rest of IT services.

Year Establishments Employees (mid-March) Annual payroll Average pay
2012 13,950 436,253 $39.1B $89,694
2013 14,276 488,879 $43.0B $87,997
2014 13,903 526,302 $48.2B $91,541
2015 13,599 539,171 $50.9B $94,443
2016 13,566 462,391 $44.1B $95,285
2017 17,597 525,528 $53.8B $102,369
2018 17,526 546,889 $57.7B $105,486
2019 17,297 552,937 $62.3B $112,596
2020 17,273 557,409 $67.0B $120,284
2021 17,297 552,789 $83.9B $151,831
2022 17,539 570,188 $83.2B $145,906
2023 18,544 629,527 $93.0B $147,665

NAICS 518210 is not a count of data center buildings. It covers establishments whose main activity is hosting, data processing, or providing computing infrastructure, including offices. Data centers owned by companies in other industries (for example, a retailer’s own facility) are counted in the owner’s industry. The jump between 2016 and 2017 (13,566 to 17,597 establishments) appears in the Census files without a code change, so compare years from 2017 on.

Efficiency and water

LBNL estimates the national average power usage effectiveness (PUE, total facility power divided by IT equipment power) fell from 1.6 in 2014 to 1.4 in 2023, mainly because more servers moved into large hyperscale and colocation facilities. Infrastructure such as cooling fell from about 40% of data center electricity in 2014 to 30% in 2023. Direct water use rose from 21.2 billion liters in 2014 to 66 billion liters in 2023 (about 17.4 billion US gallons), and LBNL projects hyperscale facilities alone could use 60 to 124 billion liters in 2028.

Data center statistics at a glance, year by year

Year Data center electricity (TWh, LBNL) Share of US end use US electricity end use (TWh, EIA) Private data center construction NAICS 518210 establishments Employees Payroll
2014 ~60 1.5% 3,903 $1.8B 13,903 526,302 $48.2B
2015 ~61 1.6% 3,900 $2.7B 13,599 539,171 $50.9B
2016 ~64 1.6% 3,902 $4.1B 13,566 462,391 $44.1B
2017 ~70 1.8% 3,864 $4.7B 17,597 525,528 $53.8B
2018 76 1.9% 4,003 $6.9B 17,526 546,889 $57.7B
2019 ~89 2.3% 3,954 $8.5B 17,297 552,937 $62.3B
2020 ~106 2.7% 3,856 $9.2B 17,273 557,409 $67.0B
2021 ~128 3.2% 3,945 $9.9B 17,297 552,789 $83.9B
2022 ~151 3.7% 4,067 $12.6B 17,539 570,188 $83.2B
2023 176 4.4% 4,011 $20.0B 18,544 629,527 $93.0B
2024 4,110 $34.8B
2025 4,195 $49.7B
2028 scenario 325 to 580 6.7% to 12.0%

~ marks values read from LBNL Figure ES-1. LBNL publishes no single-year estimates for 2024 to 2027, only a scenario band. CBP data end in 2023.

What this means for MSPs

The server room is losing share. LBNL estimates about 75% of US servers sat in hyperscale and colocation facilities by 2023, and construction at an $85 billion annual rate adds more of that capacity every month. That supports moving client workloads out of closets and into colocation or cloud, with the MSP managing the stack rather than the room. Power is the constraint to check: before signing a multi-year colocation contract, ask the provider what utility capacity is committed for its expansion, especially in the states where commercial electricity sales have grown fastest. For clients who keep equipment on site, LBNL attributes most of the national PUE gain to the move into large facilities and notes that real systems rarely perform as well as their design, which makes small rooms a reasonable target for consolidation projects. Hiring is the last pressure point. Employers in NAICS 518210 paid $148k on average in 2023, more than double the all-industry figure, and MSPs hiring infrastructure technicians compete with them; our MSP industry statistics track pay at managed IT firms.

Frequently asked questions

How much electricity do data centers use in the US?

US data centers used about 176 TWh in 2023, or 4.4% of all electricity consumed in the country, according to Lawrence Berkeley National Laboratory. That is an average draw of about 20 gigawatts around the clock, and equal to 12% of what every US home bought from utilities that year.

Does the US have enough electricity for data centers?

Data center use rose by about 100 TWh from 2018 to 2023 while total US electricity end use rose by only 8 TWh, so other uses fell to make room. LBNL’s scenarios put data centers at 325 to 580 TWh in 2028, or 6.7% to 12.0% of US demand, which would require 74 to 132 GW of power.

How much power does a data center use per day?

Across all US data centers, 176 TWh a year works out to about 482 gigawatt hours per day in 2023. No federal source reports electricity use facility by facility, so per-site figures in circulation are estimates.

How much is being spent to build data centers?

Private data center construction was $49.7 billion in 2025, up from $1.8 billion in 2014, according to the Census Bureau. In August 2026 the seasonally adjusted annual rate reached $85.0 billion, 11% of all private nonresidential construction.

How many people work in data centers?

The Census industry that covers data processing, hosting, and computing infrastructure providers (NAICS 518210) had 629,527 employees at 18,544 establishments in 2023, with average pay of $147,665. That industry also includes hosting and data processing offices, and some company-owned data centers are counted under their parent’s industry.

How many data centers are there in each state?

Federal statistics do not publish an official count of data center buildings. Our companion report on data centers by state combines a PNNL map of data center facilities with Census establishment counts and EIA electricity sales for all 50 states.

Download the data. us-data-center-statistics-2014-2026.csv (CSV). Licensed under CC BY 4.0: free to reuse with attribution to The Uptime Report.

Methodology

Electricity. Lawrence Berkeley National Laboratory, 2024 United States Data Center Energy Usage Report (Shehabi et al., LBNL-2001637, December 2024), retrieved October 2026. Values for 2018, 2023, and 2028 come from the report text, which also gives about 60 TWh a year for 2014 to 2016. Values for 2014 to 2017 and 2019 to 2022 in our table were read from Figure ES-1 (Figure 5.5) by measuring the pixel position of the line against the chart axes; the method reproduces the stated values within about 1.5 TWh (it reads 77 TWh for 2018, where the text says 76). Shares divide LBNL TWh by EIA total electricity end use (Monthly Energy Review Table 7.6, retail sales plus direct use), which reproduces LBNL’s 1.9% (2018) and 4.4% (2023).

Construction. U.S. Census Bureau, Value of Construction Put in Place (C30), private construction, data center category, monthly from January 2014 to August 2026 (release of October 1, 2026). Annual and year-to-date values sum the not seasonally adjusted monthly series; monthly comparisons use the seasonally adjusted annual rate. Before 2014 Census included data centers in general office. The last two months are preliminary or revised and will change.

Employment. U.S. Census Bureau, County Business Patterns national files, 2012 to 2023, NAICS 518210, all legal forms of organization. Employment is for the pay period including March 12. NAICS 518210 maps one to one between the 2017 and 2022 NAICS editions.

Limitations. No federal agency measures data center electricity use directly; LBNL’s estimate is a model built on server shipments, operating assumptions, and cooling simulations. EIA does not report data centers as a separate sector. Census construction values cover private projects only and are survey estimates with sampling error.

Not advice. This is an analysis of public statistics, not an investment or procurement recommendation.

Cite as:The Uptime Report. "Data Center Statistics 2026: Power Use Rose 100 TWh While US Demand Rose 8, and Construction Hit $85 Billion." October 2026. https://theuptimereport.com/data-center-statistics-2026/

References

  1. Shehabi, A. et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory, LBNL-2001637 (doi:10.71468/P1WC7Q). Accessed October 2026.
  2. U.S. Energy Information Administration, Monthly Energy Review, Table 7.6 Electricity End Use. Accessed October 2026.
  3. U.S. Census Bureau, Construction Spending (C30), historical value put in place tables. Accessed October 2026.
  4. U.S. Census Bureau, County Business Patterns datasets, 2012 to 2023. Accessed October 2026.
  5. U.S. Census Bureau, 2017 to 2022 NAICS concordance. Accessed October 2026.

Research library

More original data reports from The Uptime Report. Every report includes its methodology and a free CSV download. Browse all research

Threats and breaches

Infrastructure and uptime

Regulation and disclosure

Workforce and pay

MSP market and spending

Comments

3 responses to “Data Center Statistics 2026: Power Use Rose 100 TWh While US Demand Rose 8, and Construction Hit $85 Billion”

  1. […] Data Center Statistics 2026Data center power, spending, jobs […]

  2. […] Data Center Statistics 2026Data center power, spending, jobs […]

  3. […] Data Center Statistics 2026Data center power, spending, jobs […]

Leave a Reply

Your email address will not be published. Required fields are marked *